Riyad / Interests / Semiconductors & Regret

Interests

A sober, entirely serious look at the semiconductor memory industry, written by someone who is definitely not using an HBM-powered GPU to browse Twitter while pretending this is research.

SYSTEM STATUS: ONLINE/CYCLE: ACTIVE/REASON: UNCLEAR
Live Feed

Memory Cycle Tracker

It's Complicated

Analysts have published three conflicting reports this week alone. Inventory is both too high and too low. No one knows anything.

[ Strategy: Stare at a chart until you see a pattern. Then ignore it. ]

[ Auto-advances every 5s because the cycle waits for no one. Click a phase to override. ]

Bandwidth Crisis

HBM: The Thirst is Real

At some point in 2023, the collective semiconductor industry woke up and realized that AI accelerators need memory bandwidth in amounts normally associated with a small country's internet backbone. The solution? Stack DRAM dies on top of each other until the thermal density approaches the surface of the sun, then call it HBM3E and ship it.

The current state of play: every HBM supplier is sold out through 2027. NVIDIA is buying every micron (pun intended) of capacity. SK hynix achieved HBM market leadership by simply not messing up their TSV process, which turns out to be harder than it sounds. Samsung is doing great if you ignore their HBM3E qualification delays. Micron is trying really hard and that's what counts.

Industry Bandwidth DemandINFINITY AND BEYOND
[ 0 MB/s ][ SUPPLY ][ ∞ MB/s ]

The gap between the line and 100% represents the industry's collective delusion that HBM4 will fix everything.

~1.6 TB/s

HBM3E Bandwidth

Enough to read every Wikipedia article 3 times per second. You'll use it for a chat bot.

100%

HBM Capacity Sold Out

Through 2027. Yes, 2027. No, we don't know what happens after that either.

~40%

HBM Share of DRAM Bits

By 2028. The rest goes to your laptop's 16 GB DIMM that you'll never upgrade.

Manufacturing Realities

Fab Dreams and CapEx Realities

Building a leading-edge fab costs approximately $20 - 30 billion and takes 3 - 5 years, assuming no geological surprises, trade embargoes, or unexpected shortages of ultra-pure water. By the time the fab comes online, the node it was designed for is already two generations behind, but don't worry - the industry just renames everything so your 3nm fab is actually 2nm now. Problem solved.

EUV lithography tools, each costing around $200 million and requiring a vacuum system that could double as a space simulator, have a lead time measured in quarters. ASML ships roughly 40 - 50 High-NA EUV tools per year. TSMC buys most of them. Samsung and Intel fight over the remaining ones like siblings arguing over the last piece of cake, except the cake costs a quarter billion dollars and requires its own cleanroom.

2019

Fab construction begins. Groundbreaking ceremony. Speeches about the future of semiconductors.

2021

Building shell completed. Tool installation begins. Delays from missing parts (obviously).

2023

Fab starts qualification runs. Yield is terrible. Everyone expected this. Everyone is still disappointed.

2025

Fab reaches volume production. The node it was designed for is now called 'legacy.' A new fab is already being planned.

Current Lead Time Index
EUV Tool (High-NA)
18 - 24 months/panic
Advanced Node Wafers
12 - 16 weeks/elevated
Standard DDR5
6 - 8 weeks/normal
Design Feedback from Fab
6 months (if no errors)/uh-oh
Recent History

A Brief Chronicle of the Current Cycle

2021

Everyone says memory is a cyclical nightmare. Build more fabs anyway.

2022

Memory prices collapse. Everyone acts surprised. The cycle works exactly as it always has.

2023

AI appears. Suddenly 8-stack HBM is the most important thing in the known universe.

2024

HBM is sold out until 2027. Samsung, SK hynix, and Micron begin a holy war over channel bandwidth.

2025

HBM4 announced. Everyone pretends HBM3E is obsolete. The cycle resets but faster.

2026

Current year. The cycle enters its most advanced phase yet: 'It's Complicated, But With AI.'

Reference

Field Guide to Industry Terms

Node
A marketing term loosely correlated with physical transistor dimensions. 3nm means whatever we want it to mean.
EUV
Extremely Expensive Ultraviolet. A machine that costs more than a naval destroyer and requires its own gravitational field to operate.
Yield
The fraction of dies on a wafer that are not decorative. Single most prayed-over metric in the industry.
Bandwidth
A number that is never, ever large enough. You could have a petabyte per second and you'd still complain about memory-bound kernels.
Capex
The art of spending $25 billion on a building that will be obsolete before the concrete cures.
HBM
High Bandwidth Memory, or How to Stack DRAM Dies Until They Thermally Self-Destruct. Currently the only game in town.
Lead Time
The interval between placing an order and forgetting why you placed it. Measured in quarters, sometimes geologic eras.
Inventory Correction
Industry-speak for 'we made a truly unreasonable amount of DRAM and now we're eating the cost.' Happens every 18 months like clockwork.

[ EOF / END OF INTERESTS / CYCLE CONTINUES INDEFINITELY ]